Video


Aerzen Delta Hybrid Case Study Video

Source: Aerzen
       To access this content please Register or Sign In.   
Details

aerzencsvid

The first installation of the new technology — Aerzen's Rotary Lobe Compressor — saves 30% energy usage in the Huntington, NY Wastewater Treatment plant. This is a side-by-side comparison of the existing blower versus the new Delta Hybrid technology. The monitoring and results were provided by the Town of Huntington. The existing blowers are only two years old and the new Delta Hybrid outperforms them.

Downloads

       To access this content please Register or Sign In.   
Aerzen Delta Hybrid Case Study Video

Register Today. It's Fast And Free.

The content you requested is only available to registered users of Public Works.com. By registering now, you'll get exclusive access to this piece of content and thousands of addtional articles and product reviews across our entire network of sites.

Already Registered? Sign In.

Forgot your password?


Most Popular

Need Information?

Please wait... busy